Williams

Moves about a third of US natural gas, now building AI power plants.

Hard to displace
Assessed 20 July 2026 · Evidence as of 20 July 2026
Strong structural protection; the business model survives ai pressure.
On the recordSince 20 July 2026 · Checkable from Aug 4, 2026 · Every call on the record Checkpoint: Q2 2026 earnings report and Power Innovation project updates
The call

Williams runs the fee-based gas pipelines that power grids need, and is now selling gas-fired electricity straight to Meta's data centers.

Williams Companies operates 33,000 miles of pipelines that carry natural gas across America under long-term contracts with guaranteed fees approved by regulators. This pipeline business generates steady cash and is extremely difficult to replace because building new pipelines takes years and requires government permits and land rights that have existed for over a century. The company is also betting on a newer business called Power Innovation that builds power plants for artificial intelligence data centers, funded by a $5.34 billion deal with Blackstone and serving customers like Meta, but Meta, Microsoft, and Google are increasingly building their own power plants instead of buying from Williams, which could shrink the profit potential of this growth opportunity. The key question over the next two years is whether Williams can convert its 6 gigawatts of announced power projects into actual operating plants before the tech giants decide they do not need outside power suppliers, and whether earnings in mid-2026 and project completions between late 2027 and 2030 show the growth story is real.

Why
01
AI pressure: None apparent. AI data center demand is a customer for Williams, not a predator; Meta buys its gas power rather than replacing its pipelines. Could AI do the core job? Unlikely.
02
Bigger players: Meta, Microsoft, Google building their own behind-the-meter gas generation. If hyperscalers self-build power instead of buying from Williams, the new Power Innovation growth leg shrinks, but core pipelines are untouched. Could a giant copy it? No, they are blocked.
03
What protects it. Over 33,000 miles of regulated pipeline and century-old rights of way that a new entrant cannot build at this scale within years.
What would change this call
Whether Meta, Microsoft, or Google build behind-the-meter gas power themselves instead of using Williams. Would show hyperscalers bypassing Williams' Power Innovation middleman model.
Whether Williams' 6+ GW announced power pipeline converts to signed, in-service capacity by 2027-2028. Would show whether AI-power demand is real revenue or just announced intent.
Outcome of Second Circuit litigation over the Constitution Pipeline FERC order (filed by NY DEC, mid-2026). Would show whether regulatory or legal challenges can slow Williams' pipeline expansion.
Key numbers
  • Moves roughly 33% of US natural gas; Transco carries about 15% (2026-07-20)
  • 2025 Adjusted EBITDA hit a record $7.75B, up 9% 5yr CAGR (2026-02-10)
  • Blackstone-led group paid $5.34B for 49% of five power projects (2026-07-13)
Named risks
  • Hyperscalers self-build behind the meter power instead of buying from Williams' Power Innovation unit. Severity: medium
  • Litigation over Constitution Pipeline and other FERC approvals could delay expansion projects. Severity: medium
  • Off-balance-sheet financing structure of the Blackstone deal drew investor uncertainty, WMB fell 3% on announcement day, July 14, 2026. Severity: low
  • Execution risk across multi-year projects with 2027 to 2030 in-service targets (NESE, NEO, Silver Spur). Severity: medium
  • AI power demand thesis underpinning Power Innovation capex could disappoint if data center growth slows. Severity: medium
Rivals, as read in July 2026
RivalDirectionEvidence
ONEOKcontestingONEOK posted $35.2B revenue vs Williams $11.95B as of July 13, 2026
Kinder MorgancontestingKinder Morgan revenue $17.52B vs Williams $11.95B, both major gas pipeline operators, as of July 13, 2026
Metagaining onMeta is a named ~200MW customer of Williams' Socrates Ohio project as of July 15, 2026
Hyperscalers (Meta, Microsoft, Google) self-building powerlosing toMeta independently fast-tracking own Ohio gas plants, reducing reliance on Williams behind the meter offering, as of July 18, 2026
Constellation EnergycontestingConstellation named as adjacent power incumbent competing for AI data center power supply, 2026
Questions people ask
Is Williams Companies profitable in 2026?
Yes. Williams reported trailing twelve month net income of about $2.62 billion with a net margin near 20.6% as of July 14, 2026, on FY2025 revenue of $11.95 billion, up 13.78% year over year, per MarketBeat and StockAnalysis data.
Who owns Williams Companies?
Williams (NYSE: WMB) is a standalone public corporation with no parent company, market cap about $89.7 billion and share price around $74.39 as of July 20, 2026, per GuruFocus. It also sold a 49% noncontrolling stake in five power projects to Blackstone led investors in July 2026.
Could AI replace Williams' pipeline business?
No. Williams' core moat is 33,000+ miles of FERC regulated physical pipeline and century old right of way that AI cannot replicate or automate away. AI data center demand is instead a tailwind, driving Williams' new Power Innovation segment and a $5.34 billion Blackstone led capital deal announced July 13, 2026.
Is Williams Companies a safe employer to join in 2026?
Williams reports 6,000+ employees on its own site as of April 2026, with other trackers citing 5,987 to 10,000; no layoffs were found in current sources. The company posted record 2025 Adjusted EBITDA of $7.75 billion and raised its dividend 5% to $2.10 per share for 2026.
Who is Williams Companies' biggest competitor?
In midstream pipelines, peers by revenue include ONEOK ($35.2B), Kinder Morgan ($17.52B), and Targa Resources ($16.56B) as of July 13, 2026 per StockAnalysis. In AI power supply, the emerging competitive risk is hyperscalers like Meta building their own behind the meter gas generation instead of buying from Williams.
What is the Williams and Blackstone AI power deal?
On July 13, 2026, Williams signed a $5.34 billion capital partnership with a Blackstone Credit and Insurance led group including Apollo and KKR, selling a 49% noncontrolling stake in five Power Innovation projects while retaining 51% and full operational control, per Williams' own announcement.
Timeline
  • 2026-07-14WMB stock fell as much as 3% on the day of Blackstone deal announcement
  • 2026-07-13Williams signs $5.34B Blackstone led capital deal for 49% stake in five Power Innovation projects
  • 2026-05-27NY DEC sues FERC in Second Circuit over Constitution Pipeline rehearing dismissal
  • 2026-05-05Q1 2026 earnings recap details NEO, Atlas and Silver Spur data center power projects
  • 2026-04-14Williams breaks ground on NESE pipeline project in Brooklyn, targeting Q4 2027 in-service
  • 2026-02-10Williams reports record 2025 Adjusted EBITDA of $7.75B and issues 2026 guidance
  • 2025-07-01Chad Zamarin becomes President and CEO; Alan Armstrong becomes Executive Chairman
  • 2024-10Southeast Supply Enhancement Project filed with FERC
Revision history
20 July 2026
First assessed. Hard to displace. The text above is fixed as of this date and is not edited afterwards.